Project Details
Location: Edmonton, AB, Canada
Owner: City of Edmonton
Construction of a bridge replacement on 82nd Ave over an active roadway. Rapid-Span fabricated and erected the steel structure for this 98.3 metre long bridge. Steel erection took place during scheduled evening road closures.