Project Details

Location: Near Hinton, AB, Canada

Owner: Burlington Resources Canada Energy Ltd.

Construction of an aerial pipeline truss bridge where directional drilling was considered too costly. The 92 metre long clearspan bridge carries pipelines and a walkway across the Berland River. Rapid-Span fabricated and painted the steel structure.