Project Details

Location: Near La Loche, SK, Canada

Owner: Saskatchewan Ministry of Highways and Infrastructure

Construction of a bridge through the Design-Build process for the Turnor Lake Community over Mikikwan Bay. Rapid-Span fabricated all the precast components for this 30m long, 3 span bridge. Precast components included pile caps, retaining walls, and pre-stressed box girders.