Project Details

Location: Sheridan, MB, Canada

Owner: Government of Manitoba Aboriginal and Northern Affairs

The construction of a permanent vehicular bridge in Sheridan, approximately 110km NE of Flin Flon, MB. The short 8.6 metre long bridge was designed for accelerated construction utilizing all precast concrete components that minimized the construction time on site in this northern Canadian community. Rapid-Span supplied the fabrication of structural components of the short span precast bridge including precast slab girders, precast barriers, precast caps/ballast walls, and galvanized guardrail.